Every electrical quote starts with a count of what is on the drawings. We tested how far Claude could take that work on a real job for a local client, and what it means for speed, accuracy and the cost of getting a quote wrong.
Every electrical quote begins the same way. An estimator sits with the drawings and counts: each downlight, socket outlet, switch, floor box and distribution board, and every metre of LED strip. On a commercial building that means hundreds of symbols, many of them small, crowded together or repeated across the power and lighting sheets. The work is slow and tiring, and one missed line can cost the contractor money that never comes back.
The images in this article are illustrations only, not the actual job, as the client’s plans are confidential. The data is a real example from a local client, an established electrical contractor. We ran the trial on one of its live jobs: a commercial office development. The question was simple. Could Claude read the drawings the way a senior estimator does, and could the contractor trust what came back?

What Claude was given
Two working drawings: an electrical power layout and a ceiling and lighting layout. Both were dense. They carried dozens of symbol types, a legend of fitting codes, notes on mounting heights and controls, and runs of LED lighting that have to be measured rather than counted. The power layout alone held 385 point items.
What came back
For each drawing, Claude produced two things:
- A takeoff workbook. Every item listed by type and fitting code, with quantities, LED lengths and a list of queries for the contractor or the architect. The totals are formulas, not typed numbers, so they can be checked.
- A marked-up copy of the drawing. Every counted item carries its own numbered tag, so an estimator can check any figure against the plan in seconds instead of recounting it.
Across the two drawings, Claude counted 598 fittings and about 417 metres of LED lighting, and raised 19 queries. The images show the same idea on a small fictional flat: the plan as drawn, then the same plan with every fitting found, classified and counted room by room.

Speed
The lighting layout, a drawing type Claude had not worked on before for this contractor, took six minutes: 213 fittings, about 284 metres of LED, the workbook and the marked-up drawing. Allow around half an hour for an estimator to check the marked-up copy, and the whole task is finished well inside an hour.
Then the architect issued a revised power layout. Comparing the two issues took Claude three minutes. It produced a table of every change and a colour overlay of the drawing, with additions in green and removals in red. Comparing Claude’s counts line by line with the contractor’s own estimate took another four. In all, the three tasks took 13 minutes of Claude’s working time.
A fair caution: these times were recorded by an experienced Claude user. As part of the engagement, we set up the same skills in the contractor’s own Claude account and train its team to use them.
Accuracy
Speed is worthless if the count is wrong. Two things make this count trustworthy. The first is traceability: every number in the workbook points to a numbered tag on the drawing, so nothing has to be taken on faith. The second is the line-by-line comparison with the contractor’s existing estimate. On several fitting types the two agreed exactly. Where they differed, each difference had a cause that could be traced: the estimate had been priced on an earlier issue of the drawing, some lines were allowances for items not drawn, and some LED lengths still needed confirming.
Those are exactly the questions an estimator wants raised before a quote goes out, not after the job has started.
Where the money is
The saving in estimator hours is real, but it is not the biggest one. The costly mistakes in contracting are the ones nobody sees until the job is under way: sockets added in a revision that never reached the price, a distribution board that appears on the second issue of a drawing, exterior lighting controls mentioned in a note but never drawn.
On this trial, one revision of the power layout added 34 socket outlets, four USB outlets and a second distribution board, and changed the drawing’s status from “for construction” to “not finalised”. Each of those sockets has to be supplied, installed, wired and priced. Missed at quote stage, that cost comes straight out of the contractor’s margin.
A count that takes minutes also changes how a team works. Revised drawings can be checked every time they arrive, not only when someone has time. Quotes go out sooner. And estimators spend their hours on judgement, such as pricing, buildability and the open queries, rather than on counting symbols.
Getting better with every job
The method improves as more of a contractor’s work passes through it, though not in the way many people assume. Claude is not retrained on the client’s drawings. Instead, what we learn on each job is written into a reusable skill: a set of instructions and tools that Claude follows every time it reads a drawing for that business.
Each past job adds to the skill: the contractor’s own symbols and fitting codes, the standards it works to, and the habits of particular architects whose drawings it receives. Completed jobs with a known final bill of materials become test cases. When the method changes, it is run again against those jobs to confirm the counts still agree. The first drawing from this trial is already one of those benchmarks.
That is why we call a first job a limited trial. The more past drawings and completed projects we work through together, the closer the tool fits the business, and the more accurate it becomes.
From count to quote
The count is the foundation, not the finish. The next stages turn the fitting schedule into a full bill of materials priced against the contractor’s own supplier price lists, then add labour hours from its own labour norms. At that point a drawing becomes a priced quote in a fraction of the usual time, and every line can still be traced back to a symbol on the plan.
Drawings are commercially sensitive, so it matters where they go. When Claude works through the Claude desktop app, the drawings stay in the folders the business chooses to connect, and on Claude’s business plans Anthropic does not use your files or conversations to train its models by default.
Where to start this month
Take one job you have already quoted and built. Note how long the takeoff took, and list everything that was missed, added or changed after the quote went out. That list is your baseline, and it tells you what a faster, traceable count is worth to your business.
If you would like us to run the same test on one of your past jobs, contact andrew@insightaiafrica.co or visit insightaiafrica.co.